This prestigious project, constructed in an up-and-coming area of north Manchester, consisted of 1 & 2-bed apartments.
Type
Private Housing
Duration
13 weeks (main structure)
Complexity
The 3 blocks ranged between 4-6 storeys, with stepped elevations and low-pitch interconnecting roofs. The Communal areas featured large areas of full height glazing.
Measured Benefit
Timberframe construction provided our client with the fastest build time given the constraints of the lead-in period and site accessibility. This allowed Bellway block-by-block completions providing early sales revenues from the project.
Endorsement from Bellway Homes (NW)
"For this project we are pleased to have had Robertson Timberkit on board - it has allowed all three apartment blocks to be erected so much quicker than masonry-build could achieve."