As a commercial accommodation provider, Travelodge view new projects from the perspective that the longer they take to build, the more potential room revenue they lose out on. So with build speed being of key importance, Travelodge opted for the benefits of timberframe for its Guildford portfolio addition, resulting in an eight-week completion for the internal structure. This five-storey 150-bed Travelodge featured an integral leisure centre.
Type
Hotel
Size
150 beds
Duration
8 weeks
Complexity
The building included a striking curved roof outline with metal finishes and feature glazed stair towers.
Measured Benefit
The fast timber frame build programme allowed room revenue to be brought forward with the hotel opening ahead of the crucial Christmas and Easter period.
Endorsement from Anglo Holt Construction
"Robertson Timberkit managed to incorporate the curved feature roof into our design scheme with maximum impact. We achieved both an impressive speed of build and striking appearance for our building."